Skema internasional, perkuliahan disusun dalam 8 semester (4 tahun) sesuai ketentuan dari Dikti, dengan memperhatikan beban persemesternya tidak lebih dari 20 SKS , dan maksimal 6 mata kuliah diluar mata kuliah praktikum. Strukturnya adalah sebagai berikut:
Tabel 5.2 Susunan Mata Kuliah Kurikulum 2016 per Semester
Table 5.2 The Composition of the Course on Curriculum 2016
Semester 1 | 1st Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | IEH1B4 | FISIKA DASAR | 4 | 1 | IEH1B4 | BASIC PHYSICS | 4 | |||||||
2 | MUH1A4 | KALKULUS 1 A | 4 | 2 | MUH1A4 | CALCULUS I A | 4 | |||||||
3 | IEH1G3 | EKOLOGI INDUSTRI | 3 | 3 | IEH1G3 | INDUSTRIAL ECOLOGY | 3 | |||||||
4 | LUH1A2 | BAHASA INDONESIA | 2 | 4 | LUH1A2 | BAHASA INDONESIA | 2 | |||||||
5 | LUH1B2 | BAHASA INGGRIS 1 | 2 | 5 | LUH1B2 | GENERAL ENGLISH | 2 | |||||||
6 | IEH1A3 | PENGANTAR TEKNIK INDUSTRI | 3 | 6 | IEH1A3 | INTRODUCTION TO INDUSTRIAL ENGINEERING | 3 | |||||||
7 | IEH1F1 | PRAK. FISIKA DASAR | 1 | 7 | IEH1F1 | BASIC PHYSICS LABWORK | 1 | |||||||
Jumlah SKS | 19 | Total Credits | 19 | |||||||||||
Semester 2 | 2nd Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | IEH1H3 | ELEKTRONIKA INDUSTRI | 2 | 1 | IEH1H3 | INDUSTRIAL ELECTRONICS | 2 | |||||||
2 | IEH1I3 | MATERIAL TEKNIK | 2 | 2 | IEH1I3 | ENGINEERING MATERIAL | 2 | |||||||
3 | MUH1D4 | KALKULUS 2 A | 4 | 3 | MUH1D4 | CALCULUS II A | 4 | |||||||
4 | IEH1E3 | MENGGAMBAR TEKNIK DAN PRAKTIKUM | 3 | 4 | IEH1E3 | ENGINEERING DRAWING AND LAB WORK | 3 | |||||||
5 | HUH1#2 | PENDIDIKAN AGAMA DAN ETIKA | 2 | 5 | HUH1#2 | RELIGION AND ETICS | 2 | |||||||
6 | DUH1A2 | LITERASI TIK | 2 | 6 | DUH1A2 | INTRODUCTION OF ICT | 2 | |||||||
7 | SEH1F3 | PROBABILITAS DAN STATISTIK | 3 | 7 | SEH1F3 | PROBABILITY AND STATISTICS | 3 | |||||||
Jumlah SKS | 18 | Jumlah SKS | 18 | |||||||||||
Semester 3 | 3rd Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | IEH2A4 | PERANCANGAN SISTEM KERJA DAN ERGONOMI | 4 | 1 | IEH2A4 | WORK SYSTEM DESIGN AND ERGONOMICS | 4 | |||||||
2 | IEH2J2 | MEKANIKA TEKNIK | 2 | 2 | IEH2J2 | ENGINEERING MECHANICS | 2 | |||||||
3 | IEH2C3 | MATRIKS DAN RUANG VEKTOR | 3 | 3 | IEH2C3 | MATRICES AND VECTOR SPACE | 3 | |||||||
4 | IEH2D2 | PROSES MANUFAKTUR | 2 | 4 | IEH2D2 | MANUFACTURING PROCESS | 2 | |||||||
5 | IEH2E3 | PENELITIAN OPERASIONAL 1 | 3 | 5 | IEH2E3 | OPERATIONS RESEARCH 1 | 3 | |||||||
6 | SEH2A3 | STATISTIKA INDUSTRI | 3 | 6 | SEH2A3 | INDUSTRIAL STATISTICS | 3 | |||||||
7 | IEH2G2 | PRAKTIKUM PROSES PRODUKSI DAN PERANCANGAN SISTEM KERJA | 2 | 7 | IEH2G2 | PRODUCTION PROCESS AND WORK SYSTEM DESIGN LAB WORK | 2 | |||||||
Jumlah SKS | 19 | Jumlah SKS | 19 | |||||||||||
Semester 4 | 4th Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | IEH2H3 | PERENCANAAN dan PENGENDALIAN PRODUKSI | 3 | 1 | IEH2H3 | PRODUCTION PLANNING AND CONTROL | 3 | |||||||
2 | IEH2F3 | SISTEM MANAJEMEN ORGANISASI INDUSTRI | 3 | 2 | IEH2F3 | INDUSTRIAL ORGANIZATION MANAGEMENT SYSTEM | 3 | |||||||
3 | IEH2B3 | ALGORITMA DAN PRAKTIKUM PEMROGRAMAN KOMPUTER | 3 | 3 | IEH2B3 | ALGORITHMS AND COMPUTER PROGRAMMING LAB. WORK | 3 | |||||||
4 | IEH2K2 | PENGANTAR ILMU EKONOMI | 2 | 4 | IEH2K2 | INTRODUCTORY ECONOMICS | 2 | |||||||
5 | IEH2L3 | PENELITIAN OPERASIONAL 2 | 3 | 5 | IEH2L3 | OPERATIONS RESEARCH 2 | 3 | |||||||
6 | IEH2M3 | AKUNTANSI BIAYA | 3 | 6 | IEH2M3 | COST ACCOUNTING | 3 | |||||||
7 | IEH2N2 | PRAKTIKUM PERANCANGAN SISTEM PRODUKSI DAN OPTIMASI INDUSTRI | 2 | 7 | IEH2N2 | PRODUCTION SYSTEM DESIGN AND INDUSTRIAL OPTIMATION LAB WORK | 2 | |||||||
Jumlah SKS | 19 | Jumlah SKS | 19 | |||||||||||
Semester 5 | 5th Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | IEH3J3 | BASIS DATA | 3 | 1 | IEH3J3 | DATA BASE | 3 | |||||||
2 | IEH3B3 | PENGENDALIAN DAN PENJAMINAN MUTU | 3 | 2 | IEH3B3 | QUALITY CONTROL AND ASSURANCE | 3 | |||||||
3 | IEH3C2 | PSIKOLOGI INDUSTRI | 2 | 3 | IEH3C2 | INDUSTRIAL PSYCHOLOGY | 2 | |||||||
4 | IEH3D3 | PENGEMBANGAN PRODUK | 3 | 4 | IEH3D3 | PRODUCT DESIGN | 3 | |||||||
5 | IEH3E2 | EKONOMI TEKNIK | 2 | 5 | IEH3E2 | ENGINEERING ECONOMICS | 2 | |||||||
6 | SEH2C4 | PEMODELAN SISTEM DAN SIMULASI KOMPUTER | 4 | 6 | SEH2C4 | SYSTEM MODELING AND COMPUTER SIMULATION | 4 | |||||||
7 | IEH3G2 | PRAKTIKUM PENGEMBANGAN PRODUK DAN SIMULASI INDUSTRI | 2 | 7 | IEH3G2 | PRODUCT DESIGN AND INDUSTRIAL SIMULATION LAB WORK | 2 | |||||||
Jumlah SKS | 19 | Jumlah SKS | 19 | |||||||||||
Semester 6 | 6th Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | SEH3A3 | MANAJEMEN RANTAI PASOK | 3 | 1 | SEH3A3 | SUPPLY CHAIN MANAGEMENT | 3 | |||||||
2 | IEH3I3 | ANALISIS KELAYAKAN USAHA | 3 | 2 | IEH3I3 | FEASIBILITY STUDY | 3 | |||||||
3 | IEH3A3 | ANALISIS PERANCANGAN SISTEM INFORMASI DAN PENGEMBANGAN APLIKASI | 3 | 3 | IEH3A3 | INFORMATION SYSTEM ANALYSIS DESIGN AND APPLICATION DEVELOPMENT | 4 | |||||||
4 | IEH3H2 | MANAJEMEN PEMASARAN | 2 | IEH3H2 | MARKETING MANAGEMENT | 2 | ||||||||
5 | IEH3L3 | PERANCANGAN TATA LETAK FASILITAS | 3 | 5 | IEH3L3 | FACILITY PLANNING AND LAYOUT | 3 | |||||||
6 | DUH2A2 | KEWIRAUSAHAAN | 2 | 6 | DUH2A2 | ENTREPRENEURSHIP | 2 | |||||||
7 | IEH3N2 | PRAKTIKUM PERANCANGAN BISNIS DAN FASILITAS INDUSTRI | 2 | 7 | IEH3N2 | BUSSINESS DESIGN AND INDUSTRIAL FASILITY LAB WORK | 2 | |||||||
Jumlah SKS | 18 | Jumlah SKS | 18 | |||||||||||
Semester 7 | 7th Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | IEH4A3 | PERANCANGAN PROSES BISNIS | 3 | 1 | IEH4A3 | BUSINESS PROCESS DESIGN | 3 | |||||||
2 | IEH4B2 | KESEHATAN DAN KESELAMATAN KERJA | 2 | 2 | IEH4B2 | OCCUPATIONAL HEALTH AND SAFETY | 2 | |||||||
3 | IEH4C3 | MANAJEMEN PROYEK INDUSTRI | 3 | 3 | IEH4C3 | INDUSTRIAL PROJECT MANAGEMENT | 3 | |||||||
4 | IEH4E2 | PENYUSUNAN PROPOSAL ILMIAH | 2 | 4 | IEH4E2 | ACADEMIC WRITING | 3 | |||||||
5 | IEH### | PILIHAN 1 | 3 | 5 | IEH### | ELECTIVE COURSE 1 | 3 | |||||||
6 | IEH### | PILIHAN 2 | 3 | 6 | IEH### | ELECTIVE COURSE 2 | 3 | |||||||
7 | IEH4F2 | BAHASA INGGRIS II | 2 | 7 | IEH4F2 | ENGLISH FOR ACADEMIC PURPOSE | 2 | |||||||
Jumlah SKS | 19 | Jumlah SKS | 19 | |||||||||||
Semester 8 | 8th Semester | |||||||||||||
No | Kode | Nama | SKS | No | Code | Name | Credit | |||||||
1 | SEH4H2 | KERJA PRAKTEK | 2 | 1 | SEH4H2 | INTERNSHIP | 2 | |||||||
2 | IEH### | PILIHAN 3 | 3 | 2 | IEH### | ELECTIVE COURSE 3 | 3 | |||||||
3 | IEH4H4 | TUGAS AKHIR | 4 | 3 | IEH4H4 | FINAL YEAR PROJECT | 4 | |||||||
4 | HUH1G3 | PANCASILA dan KEWARGANEGARAAN | 3 | 4 | HUH1G3 | PANCASILA AND CIVICS | 2 | |||||||
5 | IEH### | PILIHAN 4 | 3 | 5 | IEH### | ELECTIVE COURSE 4 | 3 | |||||||
Jumlah SKS | 14 | Jumlah SKS | 13 | |||||||||||